[SEL] OT////// AM transmitter
fero_ah at city-net.com
fero_ah at city-net.com
Thu Dec 18 12:22:45 PST 2008
Gee Peter,
Sounds like you and Rita have some really fun holiday plans there.
I trust that you'll manage to work in a bottle of port between moving the hot
water tank and installing the ceiling & insulation. It might also be nice to
take her out for dinner over the holidays. 8-))
See ya, Arnie
Quoting Listerdiesel <listerdiesel at gmail.com>:
> We will be moving the hot water tank this weekend, and laying a new 1"
> plywood floor for the first floor, after we have revised all the
> electrics and plumbing. The back gable is completed and insulated, the
> front gable might be finished tomorrow afternoon, we should have roof
> tiles on before Xmas. Both side walls have been finished for 2 weeks
> now, and filled with Vermiculite insulation (A mica product).
>
> Got to pick up 25 X 8ft X 4ft plywood sheets on Saturday morning from
> London, then 25 sheets of 1/2" foil-back plasterboard on Monday, so we
> can spend Xmas putting up the ceiling and then laying the insulation
> on top.
More information about the sel
mailing list