[SEL] OT////// AM transmitter

Listerdiesel listerdiesel at gmail.com
Thu Dec 18 11:11:31 PST 2008


On 18/12/2008, David Rotigel <rotigel at alltel.net> wrote:
>>   once the house is
>> finished.
>>
>> Peter
>
> When on earth will that be Peter? Rita tells me that it's going to get
> cold pretty soon! You had better get a move on!
> 	Dave

Hi Dave:

We will be moving the hot water tank this weekend, and laying a new 1"
plywood floor for the first floor, after we have revised all the
electrics and plumbing. The back gable is completed and insulated, the
front gable might be finished tomorrow afternoon, we should have roof
tiles on before Xmas. Both side walls have been finished for 2 weeks
now, and filled with Vermiculite insulation (A mica product).

Got to pick up 25 X 8ft X 4ft plywood sheets on Saturday morning from
London, then 25 sheets of 1/2" foil-back plasterboard on Monday, so we
can spend Xmas putting up the ceiling and then laying the insulation
on top.

Really crappy having to live here with the builders working as well,
but they have been really good workers and worth the money we are
paying them.

We are getting there.... :-))

Peter
-- 
Peter A Forbes
Email: listerdiesel at gmail.com
http://www.oldengine.org/members/diesel
http://stationary-engine.co.uk
http://www.oldengine.co.uk



More information about the sel mailing list